You are here : Home > Design, laboratory characterization, factory acceptance tests and installation of a 2.6 MW High temperature steam electrolyser in a refinery

Design, laboratory characterization, factory acceptance tests and installation of a 2.6 MW High temperature steam electrolyser in a refinery


Published on 10 June 2025

​​Our article “Design, laboratory characterization, factory acceptance tests and installation of a 2.6 MW High temperature steam electrolyser in a refinery” is now available in open access in the International Journal of Hydrogen Energy.

Click here to read our article​


Top page